I found some time to do a little work on this West Side Highway model. The screw heads are just the right size for the rivets and much easier to use than hand forming every one of them by hand in the clay. The slots in the screws will get filled in before the panel is molded. I also roughed out the first eagle head a little bit. I also just ordered another 2 gallon kit of the rubber I need to cast a positive in the new mold for the 294 girl keystone, so next Friday I should be able to cast her, it will take the whole 2…
-
-
Sculptures out of the kiln
The kiln shut off during the night and by afternoon it was cooled down enough to open the lid and after a bit- remove the two pieces with gloved hands, the 137 came out great, it weighs 25#